St James’ Church, Goldenacre

Our church, which dates from 1888, is both a place of worship and a treasure house of the Arts and Crafts Movement in Scotland. It is home to priceless artworks, such as the complete cycle of mural paintings by William Hole, the choir stalls with their 100 carved angels, and the sculptures and stained glass by artists of national or international importance.

What have we done?

Since the plaster started falling off the south aisle ceiling in Summer 2023, we have come a long way towards restoring our building and conserving the precious artworks within it. We have appointed a heritage architect, raised money for phase 1, and completed these works. The church and hall roofs were repaired or replaced and we have a planned programme of maintenance overseen by our architect. We also appointed Karen Dundas, a specialist conservator, who protected the mural paint from flaking during the drying out of the walls. She and her team have now cleaned and repaired the chancel decoration below the Te Deum script, and some of the script itself. In addition, they have completed test patches above the script to inform the rest of the restoration. You can see how these shine alongside the untouched areas. We have also spent much of this year finalising plans for the south aisle, appointing a contractor and making funding applications. Work has now begun.

What’s next?

We’re now in the process of restoring the south aisle. It will become a multi-purpose space for a variety of groups with heating, lighting, coffee point, toilet, and flexible furniture options for different layouts. In order to stay warm and conserve energy, the new ceiling will be insulated and there will be temporary screens in place until phase 2b is completed. This work will enable us to host larger mid-week groups all year round, such as a toddler group for nursery families and a lunch club for locals. We are planning evening lectures on John’s Gospel in Lent, regular daytime groups including our existing craft group and book club, and other community events throughout the year. The scheme will also allow use of the old Vestry as a small meeting room (at present there is nowhere on-site where a quiet 1:1 chat can occur midweek). This work is being funded by grants, congregational donations and money from the sale of the church flat in Scotland Street.

Where are we going?

We are currently fundraising for the rest of the chancel renovations. This will include energy efficient heating, lighting, and completion of the mural restoration planned for summer 2027. We will be able to use the chancel foor smaller services, heritage events, smaller concerts, and quiet space for prayer and meditation. Once this is complete, we will turn our attentions to subsequent phases: Phase 2b: Transform the nave, create new toilets, vestry, entrance, and build a link to the hall. This will create flexible space for Sunday worship, celebrations and community events, a welcoming entrance foyer, more toilets, energy centre and easy access from Inverleith Row. Phase 2c: Complete restoration work. Conserve and repair stained glass, sculptures, and external stonework. Possible Phase 3: Re-order the halls. Improve facilities and use spaces more efficiently so the church and nursery have their own separate areas. We don’t yet have timescales for these phases; much depends on project costs and fundraising.